That about sums it all .. there were three groups of people. The aircon people from Gain City, the electricians and the tilers.
The tiles were still work in progress ...
.Aircon pipes - Upgraded the copper pipes to SWG-22.
Upgraded the insulation to 1/2" Armaflex Class 1. Additional $180 for Sys-3 unit and $120 for Sys-2, copper upgrade included.
Related Posts:
Renovation is tough work - Part 7
Renovation is tough work - Part 6
Renovation is tough work - Part 5
Renovation is tough work - Part 4
Renovation is tough work - Part 3
Torn Down
New Home Original Layout
Showing posts with label aircon. Show all posts
Showing posts with label aircon. Show all posts
Monday, September 29, 2014
Subscribe to:
Posts (Atom)














